Arbor and Trellis

Krista Bassen of Missouri State Design and Construction developed the designs for a metal arbor and trellis.  The arbor and trellis were constructed by Monarch Manufacturing and was painted.  The structures were installed in April (photo left).  Joe Wright of State Fruit Experiment Station field and maintenance touched up the paint after installation of the arbor (photo right).

Installing the arbor Touching up the arbor with paint